Project Overview
The project covered approximately 22,000 sq. ft. in Kishangarh, Rajasthan. The existing bitumen base provided a suitable starting point for the resurfacing work.
However, the surface contained some patches and undulations. These areas required correction before the new flooring applications.
The existing seal coat also presented another consideration. Its application was inadequate, so the selected approach included full-surface primer application.
The project followed an eight-layer synthetic acrylic flooring system. This approach combined surface correction, resurfacing, cushioning, colour coating, and final finishing.
Project Challenges
The existing bitumen surface was generally in good condition. However, several localised conditions influenced the preparation process.
Patches and Surface Undulations
Certain areas contained patches and uneven sections. These irregularities required correction before applying the new flooring system.
The preparation process therefore included Raycourt Base Refiner. This helped fill the affected areas and create a more even surface.
Inadequate Existing Seal Coat
The existing seal coat had not been applied properly. Consequently, the selected application approach required primer across the entire court.
This step helped establish suitable bonding conditions for subsequent aggregate-based coating layers. It also addressed a condition specific to this project’s existing surface.
Preparing the Surface for Multiple Coating Layers
The selected system required a consistent preparation sequence. The corrected surface needed suitable conditions for resurfacing and subsequent cushioning applications.
Therefore, each preparation stage played an important role. The sequence helped establish the foundation for the eight-layer coating system.

Raycourt’s Flooring Solution
The project required a flooring approach suited to the existing bitumen base. The selected system combined corrective preparation with multiple acrylic coating applications.
First, Raycourt Base Refiner addressed the existing patches and undulations. This helped create a more even surface before the main coating sequence.
Next, primer was applied across the entire court. This decision addressed the inadequate existing seal coat and supported bonding conditions.
Two layers of Raycourt Acrylic Resurfacer followed. These applications formed the resurfacing stage before grinding.
After grinding, three layers of Raycourt Proflex Cushion formed the cushioning stage. This was followed by one Acrylic Color Filler Coat.
Finally, one Acrylic Top Coat completed the coating sequence. The selected Grass Green, Royal Blue, and Red colours established the court’s final appearance.
Line marking followed using proper measurements. Together, these stages completed the project’s described flooring process.
Flooring Application Process
Existing Bitumen Surface Assessment
The project started with an existing bitumen base covering approximately 22,000 sq. ft. The surface was generally satisfactory but contained localised irregularities.
The assessment identified patches, undulations, and an inadequately applied seal coat. These conditions guided the subsequent preparation approach.
Patch Correction Using Raycourt Base Refiner
Raycourt Base Refiner was used to fill patches and address uneven areas. This helped improve the overall surface uniformity.
Correcting these areas was important before applying the main flooring layers. It also prepared the existing base for the next stage.
Full-Surface Primer Application
Primer was applied across the entire court surface. The existing seal coat condition made this additional preparation necessary.
Primer helped establish suitable bonding conditions for subsequent aggregate-based coating layers. However, this requirement depends on the actual condition of each bitumen base.
A properly prepared bitumen surface with a suitable seal coat may not require separate primer application. The selected approach should always reflect the existing surface and system requirements.
Two Layers of Acrylic Resurfacer
Two layers of Raycourt Acrylic Resurfacer were applied after priming. These applications formed the main resurfacing stage.
The resurfacer layers helped develop a more consistent surface. They also prepared the court for the subsequent grinding and cushioning stages.
Grinding After Resurfacing
Grinding followed the two Acrylic Resurfacer applications. This preparation activity helped prepare the surface for subsequent coating applications.
Grinding formed a separate process within the application sequence. It did not count towards the eight coating layers.
Three Layers of Proflex Cushion
Three layers of Raycourt Proflex Cushion were applied after grinding. These applications formed the cushioning stage of the selected system.
The three layers contributed to the system’s cushioning structure. They also prepared the surface for the colour coating stage.
Acrylic Color Filler Coat
One Acrylic Color Filler Coat was applied after the cushioning layers. This stage introduced the selected colours across the court.
The project featured Grass Green, Royal Blue, and Red. These colours established the visual appearance of the finished surface.
Final Acrylic Top Coat
One Acrylic Top Coat completed the eight-layer coating sequence. It followed the colour filler application.
This final coating formed the last layer of the selected flooring system. It completed the coating stage before final line marking.
Court Line Marking
The final activity involved line marking using proper measurements. This established the required court markings on the completed surface.
Line marking was a finishing activity rather than another coating layer. It brought the described flooring process to completion.
Understanding the Flooring System
The Kishangarh project featured an eight-layer synthetic acrylic flooring system. Each application contributed to the overall surface build-up, from initial bonding preparation to final finishing.
The system consisted of one primer layer, two Acrylic Resurfacer layers, three Proflex Cushion layers, one Acrylic Color Filler Coat, and one Acrylic Top Coat.
Eight-Layer Flooring Build-Up
| Sequence | Flooring Material | Layers | Application Stage |
|---|---|---|---|
| 1 | Primer | 1 | Surface bonding preparation |
| 2 | Raycourt Acrylic Resurfacer | 1 | First resurfacing application |
| 3 | Raycourt Acrylic Resurfacer | 1 | Second resurfacing application |
| 4 | Raycourt Proflex Cushion | 1 | First cushioning application |
| 5 | Raycourt Proflex Cushion | 1 | Second cushioning application |
| 6 | Raycourt Proflex Cushion | 1 | Third cushioning application |
| 7 | Acrylic Color Filler Coat | 1 | Colour application |
| 8 | Acrylic Top Coat | 1 | Final surface coating |
| Total | Eight coating applications | 8 | Completed flooring system |
Additional Surface Preparation and Finishing
The eight-layer count includes only the coating applications. The project also involved separate preparation and finishing activities.
| Activity | Purpose |
|---|---|
| Raycourt Base Refiner | Corrected existing patches and surface undulations |
| Surface Grinding | Prepared the resurfaced surface before cushioning |
| Line Marking | Established the court markings using proper measurements |
Important: Base Refiner application, grinding, and line marking are not additional coating layers. They are separate stages within the overall project process.
Before and After: Project Transformation
The original bitumen surface was generally in good condition. However, patches and undulations required correction before resurfacing.
Raycourt Base Refiner addressed these localised irregularities. Full-surface primer application followed because of the existing seal coat condition.
The subsequent applications introduced the complete eight-layer flooring system. Two resurfacer layers and three cushioning layers formed the central stages.
The colour filler and final top coat completed the coating sequence. Grass Green, Royal Blue, and Red established the finished court’s colour scheme.
Finally, measured line marking completed the described transformation. Actual before-and-after photographs will help demonstrate these changes more effectively.


Final Project Result
The Kishangarh project covered 22,000 sq. ft. of existing bitumen court surface. The completed project followed an eight-layer synthetic acrylic flooring system.
The preparation process addressed patches, undulations, and the existing seal coat condition. Two Acrylic Resurfacer layers established the resurfacing stage.
Three Proflex Cushion layers followed grinding. An Acrylic Color Filler Coat and Acrylic Top Coat completed the coating structure.
The finished colour scheme featured Grass Green, Royal Blue, and Red. Properly measured line marking completed the described flooring process.
The project demonstrates a structured approach to resurfacing an existing bitumen sports court. Each stage addressed a specific requirement within the selected flooring system.
Project Gallery






Planning Your Next Sports Court Project?
Looking for a reliable sports flooring solution? Raycourt provides professional synthetic acrylic sports flooring solutions for schools, sports facilities, clubs and institutions. Need installation assistance? We can connect you with our trusted partner installers.